Assignment
- Survey of factory and area for the crane.
- Design, descriptions, drawings for disassembly of platforms , pipes, holes in the ceiling, visualization of the lifting operations.
- Produce detail drawings for prefabrication of new pipes.

Challenge
- Old boiler had been in operation since the 1960's. All factory infrastructure built around it on all sides.
- 400 ton capasity crane needed. Where could it be placed ? Collisions?
- Work to be completed in 14 days.

Solution
- Production of accurate drawings and descriptions for disassembly, assembly, placing of crane etc.
- The crane could perform multiple lifting operations from the assigned location.